High Speed 2 (HS2) Phase 2b and beyond

CBP-8071

Published 10/08/2017 Amended 10/08/2017

Topics:  Railways

Summary

This paper summarises Phase 2b of the proposed new high speed rail line between London and the North of England (HS2). It gives a brief overview of the scheme, its costs, compensation arrangements and the preferred route. It also looks at Northern Powerhouse Rail (HS3) and high speed rail to and within Scotland.

Download

Download PDF

Original

http://researchbriefings.parliament.uk/ResearchBriefing/Summary/CBP-8071